How long does it take to customize LED signs?
The time required to customize LED signs varies depending on a variety of factors, including sign size, design complexity, production process, order volume, and the production capacity of the manufacturer. The following is a rough analysis of the time required to customize LED signs:
Design and layout stage
- Determine the requirements: The customer communicates with the manufacturer to clarify the requirements for the size, font, color, brightness, animation effect, etc. of the sign.
- Design plan: The manufacturer designs a preliminary plan for the sign according to customer needs, including font selection, layout and typesetting, etc.
- Confirm the plan: After the customer confirms the design plan, the manufacturer will make the final typesetting and detail adjustments.
- The time of this stage mainly depends on the clarity of customer needs and the design capabilities of the manufacturer, which generally takes 1 to 3 days.
Production stage
- Material procurement: According to the design plan, the manufacturer purchases the required LED lamp beads, circuit boards, shells and other materials.
- Production and processing: Carry out the welding of LED lamp beads, assembly of circuit boards, processing of shells and other processes.
- Quality inspection: Perform quality inspection on the completed LED signs to ensure that the brightness, color, animation effects, etc. meet the design requirements.
- The time of this stage mainly depends on the complexity of the production process and the size of the order. Generally speaking, it takes 1 to 3 days for the factory to produce a luminous character, and it may take 7 to 10 days to customize the luminous character signs in batches. For common LED luminous character signs (such as metal luminous characters, acrylic luminous characters, resin luminous characters, etc.), the production cycle is usually 3 to 7 days. If the customer needs a sign with a special shape or process, the production cycle may be extended accordingly.
Delivery and installation stage
- Delivery: The manufacturer will pack the completed LED sign and send it to the location specified by the customer. The delivery time depends on the transportation speed and distance of the logistics company. Generally speaking, it can arrive in 3-5 days domestically, and the time limit for foreign countries: 5-7 days for air transportation, 20-30 days for land transportation, and 45-60 days for sea transportation.
- Installation: After the customer receives the sign, he can install it by himself or entrust the manufacturer to install it. The installation time depends on the size of the sign and the complexity of the installation environment. The manufacturer usually provides installation drawings and work instructions to assist customers in installation.
Suggestions for speeding up the production cycle
- Communicate in advance: Customers can communicate with the manufacturer in advance to clarify the needs and design plans to reduce the modification time in the design stage.
- Choose common materials and processes: If possible, customers can choose common materials and processes to reduce the difficulty of production and shorten the production cycle.
- Arrange the order quantity reasonably: If the customer needs to customize the sign in batches, the order quantity can be communicated with the manufacturer in advance to ensure the production progress.
In summary, the time required to customize LED signs varies depending on many factors. In order to obtain a more accurate production cycle, it is recommended that customers communicate and negotiate in detail with the manufacturer.